Only Reliable ISO accredited and accurate testing instruments were used to ensure data integrity for precision research engineering design.
Home >Case Studies
Proven Case Study for Industrial Manufacturing Facility Plant at Tuas in Singapore
Client was having insufficient capacity and airflow problems. We did a revamp optimization without changing the whole unit which save them cost and minimize downtime without affecting their operations.
Another successful case study for a Pharmaceutical Medicine Processing Plant Facility in Singapore which we optimize the very best of their existing equipment unit to save energy consumption and reduce operating costs.
After: 7,200 CMH
Improvement enhancement lower off coil temperature
We are expert in providing the best solutions for you.